Skip to main content
Version: 2.2.2

RIRISKANALYSIS - Risk/Opportunity

This import template allows inserting:

  • Risk/Opportunity: Uncertainty events that may negatively or positively affect the organization's capacity to reach its goals.

For the insertion of each one of these items, the standard documented below must be followed.

Insert​

ColumnRequiredTypePrecisionDescription
OIDINTERFACEXTEXT32Sequential code - Identifies an item to be imported into SoftExpert Suite.
FGIMPORTXNUMERIC2Import status:
1 - New;
2 - In progress;
3 - Finished;
4 - Error.
CDISOSYSTEMXNUMERIC10Code of the system for which the integration will be performed:
215 - Code of the SoftExpert Risk component.
FGOPTIONXNUMERIC2Code of the operation to be performed:
19 - Insert risk/opportunity
NMFIELD01XTEXT50Risk/opportunity library ID #
NMFIELD02XTEXT50Plan ID #
NMFIELD03XTEXT50Responsible party ID #
NMFIELD04TEXT50Responsible team ID #
NMFIELD05TEXT50Risk/opportunity ID #
NMFIELD06TEXT50Upper element ID #
NMFIELD07TEXT255Next evaluation date
NMFIELD08NUMERIC10Execution deadline
NMFIELD09NUMERIC10Treatment ID #
NMFIELD10TEXT50Measurement unit ID #
NMFIELD11NUMERIC10Other losses
NMFIELD12NUMERIC10Appetite value
NMFIELD13NUMERIC10Tolerance value
DSFIELD01TEXT4000Description